日韩欧美视频第二区_欧美日本精品在线_久久本道综合色狠狠五月_热门国产精品亚洲第一区在线V

I. Core principles

1. Maintain objectivity, impartiality and neutrality.inspection of goodsThe post represents facts and standards and is not influenced by any party.

2、Inspections must be based on clear AQL standards, customer confirmation samples, customer information and procurement contracts and other documents.

3,inspection reportOnly quality facts are stated, and no business advice or speculation is included.

4, can not be in any form of private contact with customers or private undertaking inspection tasks.

Third-party inspection standard operating procedures and comprehensive considerations

II. Behavioral norms

1. The inspector is strictly prohibited from soliciting or accepting bribes or other benefits from the factory in any form.

2, the customer's information, inspection criteria, sampling plan and inspection results are strictly confidential.

3、When inspecting goods, you must wear the company uniform or wear the company badge or work plate.

III. Preparation for inspection (pre-inspection phase)

1. Access to information:

Obtain factory information, product standards and business contacts from inspection orders.
Obtain and familiarize yourself with all documents related to this inspection prior to departure.

2. Production progress confirmation:

Confirm with the factory in advance that the production of 100% has been completed, and the products above 80% have been packed, and make sure that the production line has been cleared and stopped, and the big goods are ready. Re-confirm the exact factory address and docking person.

3. Tool preparation:

Shooting tools, tape measure, vernier calipers, inferior stickers, color cards, calculators, multimeters, etc. (depending on the product), Site Inspection Report, Integrity Agreement.

IV. On-site check-in

1. Before entering the factory:

The inspector should ”clock in” at the factory gate or in front of the landmark sign, take photos for record, and the photo watermark should show the arrival time and geographic location (as a non-tamperable proof of the starting time and location of this inspection task).

2. Upon entering the plant:

Take the initiative to clearly state to the factory that you are a third-party quality inspector and that your duties are limited to quality assessment.

V. On-site sampling and testing procedures

1. On-site sampling:

Follows AQL standards;
Randomly selected from multiple levels and locations on the top, middle, bottom, inside, and outside of the cargo pile;
Sampling shall be carried out by the inspector himself, it is strictly prohibited by the factory personnel on behalf of the sampling.

Third-party inspection standard operating procedures and comprehensive considerations

2. Goods inspection process:

quantitative verification
Packaging inspection: check whether the mark, size, material and sealing method of the outer box meet the requirements. Check the color box, manual, nameplate, label, printed content, material, paste position is correct.
Appearance check: Check whether the product surface has scratches, shrinkage, deformation, stains, burrs, color difference and other defects. Check whether the product style, color and material are consistent with the confirmation sample.
Craftsmanship check: Check whether the assembly structure of the product is firm and whether the parts are matched. Such as the plastic parts of the injection molding process; zipper pulling is smooth and so on.
Dimensional Measurement: Measure critical dimensions using gauges to ensure they are within tolerance. Function and performance testing:
Perform comprehensive functional testing. If required, prioritize time-consuming projects such as aging tests and safety tests.
Outer box drop test: simulate the transportation process, check the protection performance of the packaging, others can be done according to requirements, such as vibration test, pressure test, etc.

Sixth, on-site communication, records, confirmation and defective products handling

Communication with the factory should be strictly centered on product quality, inspection processes and problems found on site.

Take the initiative to communicate with the person in charge of production or quality control before the inspection, and ask about the common types of defective products in the production process, the difficulties and their responses, which will help you to quickly locate the problem.

During the inspection process, all findings, including the number of defects, test data, etc., need to be synchronized and faithfully handwritten and recorded on the Site Inspection Report.

If the inspection does not reveal any problems initially, one should be vigilant in reviewing the sampling and methodology, which is usually not in line with the production norm.

Photograph or videotape all defective items, and the photographs should clearly show the details of the defects.

Site report handwriting and validation:

Immediately after the inspection, the inspector is required to clearly and completely fill in the "Site Inspection Report" on site to give a preliminary conclusion.

Be sure to invite a factory representative to review the report and sign and stamp the report.

Third-party inspection standard operating procedures and comprehensive considerations

VII. Post-inspection work and reporting

1. Report submission path:

Formal inspection reports, when completed, are submitted only through the company's internal system or to the immediate supervisor.

2. Official reports:

Timeliness: Upon return, a formal electronic inspection report is issued based on handwritten reports and photographs from the site.
Objectivity: The content of the report must be based on facts, accurate data and clear descriptions.
Completeness: The report should contain:
Basic information about the inspection (date, location, product, etc.).
Sample size and criteria.
Detailed defect statistics and analysis (with photos).
Results of each test.
Clear conclusions (adopted/pending/not adopted) and recommendations.
The official report should serve as a detailed description and support for the on-site report, and the content of the two needs to be consistent.

VIII. Precautions

Maintain professionalism: respect plant personnel, communicate in a professional manner and avoid conflict.

Continuous Learning: In-depth knowledge of the processes, materials and common problems of the products examined to continuously improve professional judgment.

Emergency Response: If the factory does not cooperate, refuses to sign or tries to bribe, etc., you should remain calm, collect evidence and report to the company immediately.

Related News

Online Customer Service
主站蜘蛛池模板: 久久精品国产亚洲精品| 久久免费福利视频| 日本成人精品在线| 国语自产精品视频在免费| 天天干天天操天天干天天操| 久久视频在线观看免费| 日韩亚洲综合在线| 91九色精品视频| 国产精品久久激情| 国产一区高清视频| 久久久久高清| 美女av一区二区三区| 日本黄网免费一区二区精品| 亚洲综合日韩在线| 国产精品国产自产拍高清av水多| 欧美日韩亚洲一| 热久久这里只有精品| 日韩五码在线观看| 日韩一级片免费视频| 日韩精品―中文字幕| 日本一区二区三区视频在线播放| 午夜精品在线视频| 婷婷亚洲婷婷综合色香五月| 一区二区三区四区欧美| 亚洲自拍中文字幕| 亚洲一区二区三区免费观看| 91久久久久久久久久| 中文字幕日韩精品无码内射| 亚洲综合日韩在线| 日韩亚洲欧美精品| 无码人妻精品一区二区蜜桃网站 | 日韩中文在线中文网三级| 不卡中文字幕av| 国产aⅴ精品一区二区三区黄| 国产精品毛片一区视频| 国产精品69av| 亚洲午夜精品一区二区三区 | 日韩精品无码一区二区三区| 一区二区在线观看网站| 日韩在线视频线视频免费网站| 日韩中文字幕在线播放|